Pre-assembly
In order to ensure successful well project implementation, materials should be selected and equipment pre-assembled by the project team.
We perform pre-assembly in strict compliance with the work schedule and the customer’s requirements for equipment.
learn more?
Download this
Presentation
Our unified storage reporting deployed in all regions where TSS operates ensures timely package pre-assembly for well casing and injection with multistage hydraulic fracturing.
For pre-assembly, many aspects are taken into account, including equipment availability at the storage location closest to the launching site, equipment testing results, available transportation for shipment to the site, and safe passages.
Package pre-assembly includes consulting the customer on equipment conformance and availability for a specific site.
Equipment is pre-assembled by a qualified engineer directly responsible for further transportation, assembly, installation and operation of the package. With such personal responsibility, TSS has an outstandingly low equipment failure rate.